PRECONSTRUCTION

We serve as your advocate from the onset of the project. Our estimators possess the knowledge and the historical data needed to uncover all cost-saving opportunities before any work begins, and our project managers mitigate risk by partnering with architects, engineers, and project consultants to identify potential risk factors and streamline project timelines.

  • Programming and space selection
  • Constructability and material availability review
  • Value engineering
  • Milestone and critical path scheduling

BACK TO TOP

CONSTRUCTION

Once documents and suppliers are finalized our project team begins supervising the day-to-day operations, monitoring the schedule, updating it daily as needed, and conducting weekly project meetings with all subcontractors and vendors. Ongoing collaboration among the entire team, from management to field personnel, ensures quality control throughout the project.

  • Prepare, bid, and award packages to qualified subcontractors
  • Manage and monitor all subcontractors and suppliers
  • Direct weekly jobsite meetings involving key stakeholders
  • Implement and oversee safety program
  • Utilize Sage 300 and Procore for management and coordination efforts

BACK TO TOP

POST CONSTRUCTION

Our commitment to client satisfaction doesn’t end when we hand you the keys to the building. From the punchlist and final inspections to testing all equipment and turning over all drawings, manuals, and warranty letters, we facilitate a smooth transition to building occupancy.

  • Start punchlist early in the process, ensure timely completion
  • Conduct testing and commissioning of all equipment
  • Coordinate final inspections and obtain certificate of occupancy
  • Conduct 11-month walk-through to verify any warranty claims

BACK TO TOP

TECHNOLOGY

Sage 300 is the cornerstone of our management reporting system. This project management software provides live updates on all aspects of responsibility, coordination, and accountability, clearly identifying action items for our team. From change orders to invoices to cost tracking, Sage 300 allows us to stay on top of project costs in real time and access project reporting from both the office and the field. With a proactive and and collaborative approach to each project, Sage 300 helps to ensure all project expectations are clear.

Integrating with Sage 300, Sage Project Center provides a secure, central online collaboration hub where JCA can collect, share, distribute, track, and take action on all project-related information. The results are smoother projects that end on time, on budget, and with less risk. This portal keeps a traceable record of every action performed on the job, and our project team uses it to share, track, and find documents they need to bring your project to completion.

Procore is a web-based team collaboration portal that streamlines project communications and documentation, improving efficiency by connecting JCA’s field and office. We use Procore for documents such as meeting minutes, drawings, submittals and RFIs, all of which is accessible to the entire project team, providing total transparency to all stakeholders. The real-time data and streamlined accessibility gives you access to the status of your project 24/7, minimizing costly risks and helping to ensure the projects stays on schedule.

OpenSpace uses 360-degree cameras, computer vision and AI to capture a complete visual record of your jobsite, share it via the cloud, and track progress remotely. JCA will upload weekly progress photos and videos of your project, allowing you to virtually walk the site and track progress from wherever you log in. With Splitscreen, you can compare between dates to see photos of what was in place before ceilings were installed or drywall was placed. On site, use Reveal Mode on your mobile device to compare current and past conditions. OpenSpace provides our clients with an objective, indisputable and complete visual record of your asset that you can use to manage stakeholders—and manage risk—throughout the entire lifecycle of your space. OpenSpace also provides a ‘digital twin’ offline deliverable file at the end of the project that your team can access at any time in the future. All of the data is yours!

BACK TO TOP

Our customized tracking mechanism provides the entire project team with valuable information regarding potential problem areas that can be resolved in real time with minimal delay and expense.
Our customized tracking mechanism provides the entire project team with valuable information regarding potential problem areas that can be resolved in real time with minimal delay and expense.
Virtually walk your site and track your project from anywhere with your mobile device.

SAFETY

At J.C. Anderson, we are uncompromising in our commitment to safety.

EVERY JOBSITE

  • JCA jobsite safety rules posted and enforced with zero tolerance policy
  • Preconstruction safety checklist filled out by Project Superintendent
  • Monthly safety audit by Safety Director and General Superintendent
  • Daily jobsite safety review by Project Superintendent
  • Hard hats/Safety glasses/Cut-resistant gloves at all times
  • Hospital/Clinic maps, first aid kit, fire extinguisher, emergency contacts

EVERY EMPLOYEE & SUBCONTRACTOR

  • Safety training for all JCA employees in the field and subcontractors
  • Documented equipment and tool quarterly safety check and GFCI log updated
  • Quarterly safety meetings at JCA main office for all employees in the field
  • Weekly Toolbox safety meetings
  • JCA safety handbook and orientation given to each subcontractor tradesman
  • All equipment safety checked before use on jobsite
  • MSDS sheets accompany all materials delivered
  • Daily progress and safety plan review

REPORTING SYSTEM

  • Daily construction reports with safety comments
  • Daily Sign-in/Sign-out log at jobsite entrance point
  • Accident/Incident report folder

BACK TO TOP

SUSTAINABILITY

J.C. Anderson is a local and national member of the U.S. Green Building Council. We completed our first LEED® project in 2002 and have extensive knowledge and experience with the documentation process associated with LEED projects, some of which include:

  • Merchandise Mart: 35,000 sq. ft, Grand Stair, food hall, corridors | LEED® Certified
  • ComEd: 415,000 sq. ft, 16-floor re-stack & renovation | LEED® Silver Certified
  • Rexam Beverage Can Company: 25,000 sq. ft. | LEED® Gold Certified
  • PNC Financial: 110,000 sq. ft. | LEED® Silver Certified
  • Merchandise Mart: 35,000 sq. ft, Grand Stair, food hall, corridors | LEED® Certified
  • NIPC – Willis Tower: 60,000 sq. ft. | LEED® Certified
  • BP America: 200,000 sq. ft. | LEED® Certified
  • PBC Ziegler: 45,000 sq. ft, 2 floors | LEED® Certified/completed under City of Chicago TIFF
  • GSA/US Military Entrance Processing Center: 31,000 sq. ft. | LEED® Certified
  • Retail Properties of America: 30,000 sq. ft. | LEED® Silver Certified

BACK TO TOP

SUBCONTRACTOR COORDINATION

J.C. Anderson has extensive experience in hiring and coordinating subcontractors to perform demolition, drywall, ceiling, electric, carpentry, millwork and tile, among many others. Our sub force also consists of 25 full-time field superintendents, many of whom have 40+ years of experience as commercial interior builders. Our project team is always on-site directing field operations, taking the lead on field problem solving and generating proactive solutions to help ensure your schedule is constantly running smoothly.

BACK TO TOP